LMI Holdings secured a $30 million loan from the IFC to support the development of solar infrastructure and a water treatment plant to serve industries.
The solar plant developed within the Tema Free Zones Enclave provides power to businesses operating within the Tema Free Zones Enclave.
The first phase of the Dawa Water Project – construction of a 11,000 cubic meters per day water supply system aims to serve industrial tenants within the Dawa Industrial Zone in Dawa. This project will source water from the lower Volta River using a conventional treatment method.
The system includes an 18.8 km of DN630 PN16 HDPE raw water pipeline and approximately 8km DN450 PN16 HDPE treated water pipeline to the Dawa Industrial Zone. With an initial installed capacity of 11,000 m³/day in Phase One, expanding to 45,000 m³/day in Phase Two, this expansion ensures a reliable and sustainable water supply for industries within the Dawa Industrial Zone, creating an enabling environment for industrial operations and growth.